AHC 6th Ave | 25m | 6s | Attainable Homes Calgary | Hindle Architects

IMG_6294.jpeg
 
Just noticing this now, but the North side wall is fully blank. Seems a bit strange not to include windows at all.
 
There looks to be a mural. I thikn the reason there is no windows is becuse these modules are all the same. Thus, the middle ones match the outside ones. Keeps it simple. And the speed of construction/delivery is quite impressive, the biggest concern is the urban design/architecture of it. Hopefully that blank wall isn't too oppressive.
 

Back
Top