So great to see this one progressing. Even if we only get one tower for now
16062392961878519235915953415068.jpg
 

MissingMiddle

New Member
Member Bio
Joined
Nov 22, 2020
Messages
83
Reaction score
230
I'd bet form work for the tower portion.

Not necessarily doubting you, but it seems weird to do it that way if they’re building the second tower. At 121m, you’d need a raft slab or some significant piles, and it’d certainly need to be lower than the height of those forms. Why pour the at grade slab without excavating underneath? It’s common for top-down construction, but that's never been done here. Also look at the location of the site office along 5th, it would be basically under the second tower. Whatever is going on, it’s interesting.
 

darwink

Senior Member
Member Bio
Joined
Oct 7, 2016
Messages
1,636
Reaction score
2,876
Not necessarily doubting you, but it seems weird to do it that way if they’re building the second tower. At 121m, you’d need a raft slab or some significant piles, and it’d certainly need to be lower than the height of those forms. Why pour the at grade slab without excavating underneath? It’s common for top-down construction, but that's never been done here. Also look at the location of the site office along 5th, it would be basically under the second tower. Whatever is going on, it’s interesting.
Oh—for the 1st tower. When the floorplate changes from the podium to the tower, they must want to be able to plug and play for the parts of the climbing form they can't reuse, instead of building them insitu and waiting a bit longer before heading up again.
 

Mountain Man

Senior Member
Member Bio
Joined
Mar 9, 2017
Messages
2,384
Reaction score
2,933
Not necessarily doubting you, but it seems weird to do it that way if they’re building the second tower. At 121m, you’d need a raft slab or some significant piles, and it’d certainly need to be lower than the height of those forms. Why pour the at grade slab without excavating underneath? It’s common for top-down construction, but that's never been done here. Also look at the location of the site office along 5th, it would be basically under the second tower. Whatever is going on, it’s interesting.
Looks like they are constructing formwork.
 