The amount of work they've done is amazing. They've now installed most of the framework for the outer shell, and swan mall looks like its almost ready to get the topsoil put back on.

IMG_9442.JPG
IMG_9444.JPG
fullsizeoutput_1773.jpeg
 

Attachments

  • IMG_9442.JPG
    IMG_9442.JPG
    220.4 KB · Views: 753
  • IMG_9444.JPG
    IMG_9444.JPG
    293.7 KB · Views: 1,008
  • fullsizeoutput_1773.jpeg
    fullsizeoutput_1773.jpeg
    246 KB · Views: 672
A few more windows in...

IMG_0003.JPG
 

Attachments

  • IMG_0003.JPG
    IMG_0003.JPG
    260.5 KB · Views: 640
A neat thing is the internal windows have what looks to be an operable panel so people can get out to work on the install of the outer glass, and all the equipment that could be between the layers of glass.

Edit:
You can really see this here. Also with this and other photos we see glass on all four sides. The internal glass is to provide a comfortable environment inside. The outer glass, at one point they were thinking about installing solar PV in-between the facades, and of course the use of solar passive heating in limited amounts, so it is very permeable to radiation. It will be interesting to see what that type on glass, the outer facade, will actually look like, given that most of the time cooling will be more important than heating, perhaps except for higher floors to create a solar chimey to passively circulate air between the facades.
upload_2018-10-4_9-8-6.png
 

Attachments

  • upload_2018-10-4_9-8-6.png
    upload_2018-10-4_9-8-6.png
    1.2 MB · Views: 660
Last edited:
From a distance it reminded me of this before things started to be added again:
upload_2018-10-11_14-49-44.png


Not as clean of course.
 

Attachments

  • upload_2018-10-11_14-49-44.png
    upload_2018-10-11_14-49-44.png
    569.6 KB · Views: 698
They are well into installing the support structure for the exterior glass layer. Very cool.

IMG_0168.JPG

fullsizeoutput_1ac4.jpeg

fullsizeoutput_1ac3.jpeg
 

Attachments

  • IMG_0168.JPG
    IMG_0168.JPG
    257.7 KB · Views: 590
  • fullsizeoutput_1ac4.jpeg
    fullsizeoutput_1ac4.jpeg
    218.4 KB · Views: 599
  • fullsizeoutput_1ac3.jpeg
    fullsizeoutput_1ac3.jpeg
    252.9 KB · Views: 590
Last edited:
Not exactly a construction update, but you can definitely see the 2nd additional floor has been completed.

fullsizeoutput_1bec.jpeg
 

Attachments

  • fullsizeoutput_1bec.jpeg
    fullsizeoutput_1bec.jpeg
    450 KB · Views: 698

Attachments

  • upload_2018-10-26_10-22-2.png
    upload_2018-10-26_10-22-2.png
    615.4 KB · Views: 628
I saw drywall and steel studs being delivered to site today, and rebar yesterday. Such a different mix we only usually see in the really big towers!
 