Era | 41.15m | 13s | Minto

Interesting to see PCL as the contractor for this build. Sign of the times to see a Contractor of this magnitude building condos.
 
I know PCL was bidding on contracts valued in the hundreds of thousands to a couple million during the boom years too. Era is in the tens of millions. This is not a sign of the times. The layoffs are.
 
I wonder if this means things are moving on this? If the project was to be postponed you expect them to sit on things for a while.

There is movement, it was never in danger.
 
There is movement, it was never in danger.
Agreed. I don't believe it was in danger overall as a project, but with Covid hitting and the state of the economy it wouldn't have been surprising to see it sit longer. Glad this is going ahead, it'll be a big boost to that part of Bridgeland...maybe enough of boost to drawn attention of full sized grocers.
 
It's gonna be pretty outstanding to have 4 high-rises (35 meters+) in Bridgeland under construction at the same time.
 

Back
Top