West Village Towers | 149.95m | 42s | Cidex Group | NORR Dubai Yahya Jan

General rating of the project

  • Great

    Votes: 8 7.3%
  • Very Good

    Votes: 15 13.6%
  • Good

    Votes: 39 35.5%
  • So So

    Votes: 13 11.8%
  • Not Very Good

    Votes: 15 13.6%
  • Terrible

    Votes: 20 18.2%

  • Total voters
    110
Also to note, it looks like they are holding off on the northern section of this project for the time being. This means that the 100 meter tower (the shortest one) is not being built at this time. At least that is how it appears currently, though there is still an excavator on site, so perhaps I'm wrong and they're just going slow on the northern part?
 
Also to note, it looks like they are holding off on the northern section of this project for the time being. This means that the 100 meter tower (the shortest one) is not being built at this time. At least that is how it appears currently, though there is still an excavator on site, so perhaps I'm wrong and they're just going slow on the northern part?

It's too early to call. They haven't started enclosing the open end of the underground parking structure and they have no dirt on site for backfilling. They need a place for staging right now. That can be moved over once the south side is built to grade allowing them to excavate the north side. It's the shortest tower. It can be built quicker than the other two.
 
It's too early to call. They haven't started enclosing the open end of the underground parking structure and they have no dirt on site for backfilling. They need a place for staging right now. That can be moved over once the south side is built to grade allowing them to excavate the north side. It's the shortest tower. It can be built quicker than the other two.

This is all true. Here's hoping! :D
 
Not really the end of the world if the north tower doesn't get built seeing as there are two other taller towers.
 
I’d be happy to sacrifice the third/fourth of all the triplet/quadruplet designs we have right now as long as the tallest gets built first. Come back later with a new design. We have enough Xerox buildings.

I’ll take the seconds because we need the residential density.
 
They are only building one tower during the first phase.

Glad we cleared that up :p Which one? I think I remember hearing definitively from someone that it was the 150-meter one going through first.
 
This morning’s action.
EBB0BEA1-8B80-47AC-8E50-252A224BE6DB.jpeg
E2952CEB-7CFE-443F-83CB-58D0D6AF3777.jpeg
0D848340-28C8-4E61-A33E-FC55BB68A61F.jpeg
15D558C3-0AB1-4332-A189-A409CC75E904.jpeg
 

Attachments

  • EBB0BEA1-8B80-47AC-8E50-252A224BE6DB.jpeg
    EBB0BEA1-8B80-47AC-8E50-252A224BE6DB.jpeg
    272.7 KB · Views: 470
  • E2952CEB-7CFE-443F-83CB-58D0D6AF3777.jpeg
    E2952CEB-7CFE-443F-83CB-58D0D6AF3777.jpeg
    214.3 KB · Views: 463
  • 0D848340-28C8-4E61-A33E-FC55BB68A61F.jpeg
    0D848340-28C8-4E61-A33E-FC55BB68A61F.jpeg
    284.7 KB · Views: 471
  • 15D558C3-0AB1-4332-A189-A409CC75E904.jpeg
    15D558C3-0AB1-4332-A189-A409CC75E904.jpeg
    280.3 KB · Views: 462
Perfect, exactly the info I had. That is great as well in that it will expand the skyline to the west pretty significantly, as it will be the only 150 meter-er west of Nexen, a distance of about 4 blocks.
 
Hi,
I Hope all 3 Towers get Blt. Hate to see a Half Completed Project Siting There. If D T West Village is to Reach Full Opportunities This Project will Make it all Happen.

Tnx,
Operater.
 

Back
Top