Calgary

The Hat | 88m | 28s | Cidex Group | NORR

General rating of the project

  • Great

    Votes: 2 4.5%
  • Good

    Votes: 14 31.8%
  • So So

    Votes: 15 34.1%
  • Not Very Good

    Votes: 9 20.5%
  • Terrible

    Votes: 4 9.1%

  • Total voters
    44

Surrealplaces

Moderator
Member Bio
Joined
Sep 24, 2015
Messages
6,086
Reaction score
11,116
I think for a rental building it's pretty solid. There has been word that this might be starting construction as word is there is some construction equipment on site. I haven't seen so myself to confirm, but if so that would be great for East Village.
 

Oddball

Senior Member
Member Bio
Joined
Mar 18, 2016
Messages
1,132
Reaction score
1,049
So with Verve, the podium of Arris and the Library all well underway, N3 and the Hilton basically done, Studio Bell, First, Simons Block and the St. Louis all finished up and now the Hat, Ink and the Alt Hotel firing up how many major projects are left for the EV?
 

Surrealplaces

Moderator
Member Bio
Joined
Sep 24, 2015
Messages
6,086
Reaction score
11,116
There is East Village Court (directly south of Evolution) though, it is in redesign, so not sure where it will end up. There is the rest of the block Verve (619, 625, 695)

Someone can correct me on this, but I believe, the rest of the lots aren't CMLC lots, so there could be potentially anything in the works.

Verve Block.

Image1.jpg
 

Attachments


Top