The Dorian | 98m | 27s | PBA Land Development | Gibbs Gage

General rating of this project

  • 1 Great

    Votes: 4 10.3%
  • 2 Good

    Votes: 29 74.4%
  • 3 So So

    Votes: 4 10.3%
  • 4 Not Very Good

    Votes: 2 5.1%
  • 5 Terrible

    Votes: 0 0.0%

  • Total voters
    39

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
3,280
Reaction score
7,181
Location
Mission
Have we received any confirmation about the aforementioned height increase to 45 storeys?
 

MichaelS

Senior Member
Member Bio
Joined
Jul 5, 2016
Messages
1,045
Reaction score
3,009
I spoke with someone at PBA Land Development (developers). It is not increasing in height from what was initially approved. The changes include a slight modification to the exterior materials, and a reduction in the amount of parking provided.
 

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
3,280
Reaction score
7,181
Location
Mission
Good to know.
 

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
3,280
Reaction score
7,181
Location
Mission
Finally.
 

Surrealplaces

Administrator
Staff member
Member Bio
Joined
Sep 24, 2015
Messages
7,524
Reaction score
17,860
Location
Calgary
Question for the construction experts. I’m watching the drilling action at site, and have noticed that they have been drilling their holes, and filling with concrete, but aren’t using any piles. Is this some sort of new technique? I thought they always put in the piles and then add the concrete after.
 

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
3,280
Reaction score
7,181
Location
Mission
Question for the construction experts. I’m watching the drilling action at site, and have noticed that they have been drilling their holes, and filling with concrete, but aren’t using any piles. Is this some sort of new technique? I thought they always put in the piles and then add the concrete after.
Huh that’s odd, that’s exactly what they are doing at Block on Fourth too.
 

Top