Sunalta Heights | 88.39m | 27s | Housing One | S2 Architecture

87C3F1F0-EF19-41AB-87EC-F51DF4530E3B.jpeg
39420F16-A859-4191-B680-1461992C2103.jpeg

They are currently taking down the shed.
 
Someone had said that ITC was getting dropped, and the developer was going to manage the construction. Don't know if that's still on.
I reported that. It was a communication from ITC to suppliers/trades. I would say the delay in getting construction going is that the developer is trying to pull a construction crew together or looking for another general contractor.
 
hopefully its a catalyst for more development. the structure across the street form this has about as brutal a streetfront as you could find in the beltline.
1) not part of the Beltline.
2) Yeah, brutal. It was built in ~1982 (the DP approval was 1981) - I-2 General Light Industrial District
3) the project was a replacement data centre for Nova Gas Transmission, which runs most of the natural gas system in the provinces.
 

Back