Residence Inn by Marriott | 127.10m | 36s | GWL | IBI Group

General rating for this project

  • Great

    Votes: 2 4.4%
  • Very Good

    Votes: 19 42.2%
  • Good

    Votes: 20 44.4%
  • So So

    Votes: 4 8.9%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    45
Here's how Place Ten a block over was supposed to interface with the underpass. Just to make it sting a little more.

close-up.jpg
 

Attachments

  • close-up.jpg
    close-up.jpg
    214.2 KB · Views: 937
I think the integration is decent considering the pump station. With the pump station stuck there, it really limits what can be done. Once it's finished it'll be decent enough, certainly 100 times better than what used to be there.
 
The integration isn't terrible considering the utility station there. They could have maybe tried to add steps as everyone suggested behind it, but I bet there is a right of way they couldn't work around.
 

Back
Top