PLATFORM | 21m | 6s | CMLC | Kasian

Glass starting to go in...

IMG_20200531_1348498.jpg
 
According to the latest CMLC blog this project is about to be topped out. It's also undergone a re-design... sadly I think it will look a lot more like a generic parkade than it did in earlier renderings and I wasn't exactly a fan of those either.

The building has a new look since the early design renderings were released due to a change in the exterior screen material. The project team made the adjustment to address anticipated challenges with the constructability of the original screen. The new design and material offer a local fabrication solution and improved long-term maintenance efficiencies while maintaining the original striking design aesthetic.

widescreen_20.07.14+Elevation+Render+Context.jpg

https://www.evexperience.com/blog/2020/7/23/future-ready-project-set-to-top-off
 