Curtis Block | 119m | 37s | ONE Properties | Arquitectonica

Golfing guy

Active Member
Member Bio
Joined
Aug 29, 2017
Messages
192
Reaction score
208
With all their trailers and other material and equipment being stored in the NW corner, I wonder if that part of the project is being left out for now. I know only 2/3 buildings are being built now, but I thought it was the north ones ?
 

gsunnyg

Active Member
Member Bio
Joined
Oct 26, 2017
Messages
495
Reaction score
907
With all their trailers and other material and equipment being stored in the NW corner, I wonder if that part of the project is being left out for now. I know only 2/3 buildings are being built now, but I thought it was the north ones ?
I thought it was going to be the two towers running along Macleod Trail, so the NE and SE sides of the site in this case while the NW tower would be left out. I believe thats how the phases were shown in one of the drawings.
 

Surrealplaces

Administrator
Staff member
Member Bio
Joined
Sep 24, 2015
Messages
6,944
Reaction score
15,181
Location
Calgary
I was hoping the two towers would be along the north side so that 12th would get a wall of retail street frontage but judging by the pile locations they are going to do the east side....unless they are going to do the underground portion for the whole parcel?
 

Cyric

Active Member
Member Bio
Joined
Oct 24, 2016
Messages
241
Reaction score
844
No, hard to see in the photos but they are cutting off the NW corner where the storage area is with the drilling, it looks like the underground of the larger eastern side is what is going in now. As for the towers, the two currently moving forward are the two on the east side.
 

UrbanWarrior

Senior Member
Member Bio
Joined
Mar 28, 2016
Messages
2,807
Reaction score
5,591
Location
Capitol Hill
Woot! Looks like we're officially UC on this one!
 

Top