BLVD Beltline | 118.87m | 37s | ONE Properties | Arquitectonica

Forms are being built for the street level step up on the north side. They have also installed the horizontal supports for the awnings.
View attachment 313033

Not a lot of exterior updates these days mostly minor tweaks and cleanup work. Glass is starting to go up on the balconies for the north tower and podium brickwork is underway on the south tower. As you can see from GoVertical's night time shots the interior work has progressed most of the way up the north tower. Should be on track for occupancy in the fall/winter.
One tweak I would've like to see in the design is some variation in the heights of the podium sections. It would've helped break up the podium massing even more. Overall great project.
 
BD44FF88-FBA2-461B-B332-F341CDC43A25.jpeg
E1E375F0-78DE-4949-A9E1-16AF1EEA2DE4.jpeg
80198E31-A815-45A3-9D11-7C952FC2B02B.jpeg
70ADAF0D-C1FC-4B81-B67B-812503A969FA.jpeg
6940AD01-2E90-45B1-8A97-9B347DB78410.jpeg
9A3FE590-9A47-4C68-AC1E-215B649BA0D0.jpeg
EB7BABB3-131B-4BA2-BD6A-F0D1AE9998ED.jpeg
7CFC6A2C-F326-48D5-BE10-F6EB30AC5BED.jpeg
1160E7DB-8D36-4C84-904C-FEA1DF80FA52.jpeg
 

Back
Top