Avenue | 74.98m | 24s | Cressey

General Rating for this project

  • Great

    Votes: 0 0.0%
  • Very Good

    Votes: 3 21.4%
  • Good

    Votes: 11 78.6%
  • So So

    Votes: 0 0.0%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 0 0.0%

  • Total voters
    14
Fair bit of glass and cladding up.

2016 June 2 170.JPG 2016 June 2 171.JPG 2016 June 2 172.JPG 2016 June 2 173.JPG 2016 June 2 174.JPG 2016 June 2 175.JPG 2016 June 2 176.JPG 2016 June 2 177.JPG
 

Attachments

  • 2016 June 2 170.JPG
    2016 June 2 170.JPG
    1.6 MB · Views: 322
  • 2016 June 2 171.JPG
    2016 June 2 171.JPG
    1.6 MB · Views: 343
  • 2016 June 2 172.JPG
    2016 June 2 172.JPG
    1.7 MB · Views: 331
  • 2016 June 2 173.JPG
    2016 June 2 173.JPG
    1.3 MB · Views: 334
  • 2016 June 2 174.JPG
    2016 June 2 174.JPG
    1.9 MB · Views: 326
  • 2016 June 2 175.JPG
    2016 June 2 175.JPG
    2 MB · Views: 328
  • 2016 June 2 176.JPG
    2016 June 2 176.JPG
    1.4 MB · Views: 323
  • 2016 June 2 177.JPG
    2016 June 2 177.JPG
    1.8 MB · Views: 367
The materials look almost the same as the Maple projects building, and the Aura towers.
 
Off topic, how much is left to do on the monestary expansion? I'm surprised to see it looking so unfinished in that shot.
 
I feel like that monastery has been in perpetual renovation/construction mode for a decade.
 
The building is okay, but the materials are the so much the same as Aura and Union Square. I wish the gray was more metallic looking.
 

Back
Top