Park Central | 134m | 39s | Hines | S.C.B.

General rating of the project

  • Great

    Votes: 23 24.5%
  • Very Good

    Votes: 52 55.3%
  • Good

    Votes: 14 14.9%
  • So So

    Votes: 4 4.3%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 1 1.1%

  • Total voters
    94
May 2, 2018

fullsizeoutput_af9.jpeg
fullsizeoutput_afa.jpeg
 

Attachments

  • fullsizeoutput_af9.jpeg
    fullsizeoutput_af9.jpeg
    280.3 KB · Views: 651
  • fullsizeoutput_afa.jpeg
    fullsizeoutput_afa.jpeg
    321.4 KB · Views: 663
Hi All,
A few Questions in Regards to the Site/Project etc. I Didn't Realize that the 2nd Bldg going Up Was Part of Hines Dvlpmnt. For some reasons I was Under the Impressions It was Some One Else's Project. Will It also Go Up at the Same Time or will It B a Phase Two Project at a Later Time? Also I Notice that Little 5 Storey Bldg (525 11th Ave) in the Back Ground in a Lot of the Pictures. Anyone Know it that Site is Due for Redevelopement etc, I stand Corrected if Not but come away with the Feelings that Bldg and
the Rest of the Block is Prime Redevelopement Territory.

Tnx
Operater,
 
Hines is just building the first tower for now, the second one is a future phase with a separate DP that has yet to be submitted.
 
May 16, 2018

IMG_20180516_202936.jpg
 

Attachments

  • IMG_20180516_202936.jpg
    IMG_20180516_202936.jpg
    417.8 KB · Views: 568
Looks like she might have bottomed out already?



fullsizeoutput_f0a.jpeg


fullsizeoutput_f09.jpeg
 

Attachments

  • fullsizeoutput_f0a.jpeg
    fullsizeoutput_f0a.jpeg
    669.8 KB · Views: 1,029
  • fullsizeoutput_f09.jpeg
    fullsizeoutput_f09.jpeg
    721.5 KB · Views: 1,109
It's not very deep. Closer to two floors down than three. With 450 units, I'm expecting five or six floors underground.
 

Attachments

  • D4839A5D-4A48-4E80-AD6C-EB1ACA288117.jpeg
    D4839A5D-4A48-4E80-AD6C-EB1ACA288117.jpeg
    253.4 KB · Views: 491
Dang was just about to post mine!
 

Back
Top