Search results

  1. C

    Calgary Regional Rail Transit

    Double track would be two lines running parallel to each other, typically with ~14' between track centers with one railroad in charge of the traffic running on both tracks. If it was separate tracks, CPKC would be responsible for traffic on their track and Liricon would be responsible for the...
  2. C

    Calgary Regional Rail Transit

    As a CP employee, with no knowledge of any MOU or plans or agreements, I think it would have been sweet to just upgrade/double up our whole mainline to make the passenger traffic work on our network. Rather than the mess of them running parallel, just have it all integrated together. Knowing...
  3. C

    Green Line LRT | ?m | ?s | Calgary Transit

    All good, I am just very excited to no longer get stuck at that crossing & light. I think both it and the pedestrian tunnel will be good for the area. Not much room on the CP side of the tracks to develop right now, but I am confident on the Ogden side developing a lot once the line opens up.
  4. C

    Green Line LRT | ?m | ?s | Calgary Transit

    The crossing is also used by other businesses on Ogden Dale Rd, which includes semi- trucks with trailers. That grade crossing is already quite tight with just the CPKC line, and the addition of 2 LRT tracks will increase the risk due to the decreased safe stopping area and large increase in...
  5. C

    Green Line LRT | ?m | ?s | Calgary Transit

    To add for the reasoning for CPKC, the orientation of Ogden Road/69 Ave/Ogden Dale Rd means that typically 5-7 vehicles get through the light to make the left hand turn onto Ogden in the afternoon, creating large backups for employees leaving. When the Green Line goes in, there won't be room for...
  6. C

    Rivers Edge | 20m | 6s | GBS | NORR

    Its even worse than just railway tracks. With the new rail bridge put in, yard switching operations are extended further West from Alyth, so there will now be even more noise from shoving cars back and forth.
  7. C

    Oakridge Co-op Redevelopment (Oakridge Crossing) | 43.89m | 12s | Calgary Co-op | Sahuri + Partners

    Looks like work is starting at the Oakridge Co-op redevelopment. Not sure which parts are going ahead when, but it is good to see work starting.
  8. C

    Aria | 22m | 6s | NORR

    On the on this page, it looks like bike lanes are planned to run on the two avenues parallel to University Ave, in addition to the existing network of multiuse pathways.
  9. C

    General Construction Updates

    There is this development permit for a rooftop patio restaurant - https://developmentmap.calgary.ca/?find=DP2019-0996 for the same block, although the location doesn't quite match up (NW instead of SW corner of the block). But I can't see a rooftop patio working anywhere else on the block.
  10. C

    Oliver | 121.3m | 35s | Centron | Gibbs Gage

    It looks like 14 units per floor ( going off off 7 balconies visible on 2 sides of the building). I counted 30 floors of balconies, and with two identical buildings that would yield 840 units.
  11. C

    Urban Development and Proposals Discussion

    The three sites for those interested, 1105, 1107, 1129. Relevant text:
  12. C

    TELUS Sky | 222.19m | 60s | Westbank | Bjarke Ingels Group

    Such a great overview of the city from the corner of the Central Library. One of my favourite places to get work done people/C-Train/Building watch
  13. C

    Urban Development and Proposals Discussion

    Meigs field closure in Chicago was different, in that the land was City owned and they didn't renew the airports lease when it expired in 1996.
  14. C

    Taza (Tsuut'ina Nation Development) | ?m | ?s | Canderel

    Update on Costco construction in Taza. The gas bar has been constructed, and the outer foundation for the main building has been poured. There doesn't appear to be construction of any other developments in this area of Taza at this time.
  15. C

    General Construction Updates

    Didn't know there was that good of view of COP from Crescent Heights! /s
  16. C

    Roads, Highways & Infrastructure

    Just a little personal photo update of work at the Anderson/SWCRR interchange. Work is underway for the road base of the WB->SB movement. Bridge girders are pre-positioned, with some already installed for the SB exit overpass. A large amount of packed gravel/dirt is piled under that overpass...
  17. C

    M2 Block | ?m | 4s | XYC | Riddell Kurczaba

    Or make them long panels like what was done in between the two windows on the floor below
  18. C

    Urban Development and Proposals Discussion

    Great to see this project going ahead finally. I know they talk about it being a tough market, but I imagine it will fill up nicely due to its proximity to both the hospital and University. I hope the Vietnamese restaurant reopens in the new building, its one of my favourites in the area. I...
  19. C

    Uxborough Phase 1 | 45m | 14s | Western Securities | Gibbs Gage

    Great to see this project going ahead finally. I know they talk about it being a tough market, but I imagine it will fill up nicely due to its proximity to both the hospital and University. I hope the Vietnamese restaurant reopens in the new building, its one of my favourites in the area. I...
  20. C

    Roads, Highways & Infrastructure

    Not sure if anyone else checks for photo updates on the SWCRR site, but it has been quite a while since the last update. I sent a message the the info@ email for the project, and got this response: So hopefully there will be an update soon. There has been a ton of progress since the last...