News   Apr 03, 2020
 6.6K     1 
News   Apr 02, 2020
 8.2K     4 
News   Apr 02, 2020
 4.8K     0 

Search results

  1. A

    The Daisy | 52m | 12s | o2 Planning and Design

    DP2025-06096, architect is Zeidler. Height is 51m based on the drawings.
  2. A

    The Daisy | 52m | 12s | o2 Planning and Design

    DP has been submitted. The design is pretty much as shown in the renders with some slight changes.
  3. A

    Broadway on 17th | 154m | 47s | Vesta | Zeidler

    Sounds like they are already negotiating with potential tenants, which is a very good sign.
  4. A

    1405 - 4th Street | 77m | 24s | GWL | Arcadis

    Don't forget Nest! Ever since 6 storey wood frame became a thing, my brain differentiates based on concrete vs wood frame rather than tower vs midrise.
  5. A

    Calgary Municipal Politics

    A lot of conservative-leaning people seem to place a lot of importance on sports. I think the fieldhouse will see broad support across council.
  6. A

    East Village Truman Hotel | 24m | 6s | Truman | NORR

    The real test will be if any of these projects break ground!
  7. A

    East Village Truman Hotel | 24m | 6s | Truman | NORR

    Actually, good point about the patio area - as currently planned it'll be in shade almost all the time. I still think the overall project is a big win, and I am confident the planning department will work with them to improve the interface with the riverfront. And I absolutely love the...
  8. A

    Calgary Municipal Politics

    To the point of rejected ballots - this might be a controversial opinion, but if someone who doesn't have a disability is incapable of figuring out how a ballot works, and doesn't mark it correctly, I'm fine with their vote not counting. But on the topic of the shift back to hand counting, I...
  9. A

    East Village Truman Hotel | 24m | 6s | Truman | NORR

    Happy Friday! DP for yet another hotel coming to Calgary, developer is...Truman! More badly needed development in East Village. I'm a fan.
  10. A

    Calgary Municipal Politics

    Anyone know when the recounts will take place? I assume it needs to commence right away since I believe swearing in takes place on the 29th. I don't expect the mayoral result to switch but that Ward 12 result is close enough where a recount could flip the ward.
  11. A

    River Club | 56m | 15s | Urban Capital | DIALOG

    NIMBYs gonna NIMBY...
  12. A

    Calgary Municipal Politics

    I believe the main threshold is a vote share difference of 0.5% or less. If Ward 9 was higher than that, perhaps there were insufficient other criteria to justify a recount? If i recall correctly, the other wards were a few hundred votes between candidates by the end, whereas Ward 12 was really...
  13. A

    Calgary Municipal Politics

    I think an opponent can ask for a recount if the difference is less than 0.5%, as Sharp has done. Certainly applies in the Ward 12 case, not sure if the gap is narrow enough for a recount to be on the table in Ward 1. But I think the defeated candidate has to ask for the recount, and so far...
  14. A

    The Galloway | 37m | 10s | Ayrshire | EFG Architects

    Hopefully if they are going through all the trouble of a name change, they're still contemplating construction.
  15. A

    Calgary Municipal Politics

    Pretty sure Wards 1 and 12 are headed for recounts with the results being so close.
  16. A

    Eau Claire Place II | 68m | 17s | Pacific Reach

    It's coming out a lot better than I expected. Nice to be pleasantly surprised for a change.
  17. A

    Calgary Municipal Politics

    Things tightened up significantly in Ward 1 the last I checked. But it does look like Wong is toast.
  18. A

    The Rise | 63m | 18s | Truman | Metafor

    Sorry meant 18
  19. A

    The Rise | 63m | 18s | Truman | Metafor

    Good news! I am surprised it didn't get appealed, although the height was already reduced to 8 storeys if I recall correctly...

Back
Top