News   Apr 03, 2020
 6.6K     1 
News   Apr 02, 2020
 8.1K     4 
News   Apr 02, 2020
 4.8K     0 

Search results

  1. N

    Block 22 | 42m | 12s | Gracorp | Zeidler

    Some equipment now onsite including a driller:
  2. N

    Autumn | 22m | 6s | Homes by Avi | LEMAYMICHAUD

    The west side of the site is now at grade:
  3. N

    SAIT Campus Centre | 24m | 5s | SAIT | GEC

    Bonus skyline pic:
  4. N

    Trinity Hills | 20m | 6s | Trinity Group

    The Podium at Aiss'ka'pooma: The retail street looks complete, but unoccupied (There is a sign for a coffee shop coming in 2025 (Fenyk)). Skyway at Medicine Hill phase 1: The road is being dug up just past the phase 1 buildings -- utility work for phase 2? Medicine Hill Block H...
  5. N

    SAIT Campus Centre | 24m | 5s | SAIT | GEC

    Some curved walls going up on the east side of the site:
  6. N

    Trinity Hills | 20m | 6s | Trinity Group

    Skyway at Medicine Hill phase 1: Tenants may be moving into the south building (saw some chairs on some of the balconies). Bucci Townhomes: Road that runs through the development (behind Wellings) has been paved. The Village Townhomes Wolf Run:
  7. N

    Trinity Hills | 20m | 6s | Trinity Group

    The Podium at Aiss'ka'pooma: Saw some tenants enjoying the evening on their balconies at the first completed building (pic #4) at the southwest corner of the site. First floor walls going up on new buildings at east side of the site. Medicine Hill Block H apartments:
  8. N

    Uxborough Phase 1 | 45m | 14s | Western Securities | Gibbs Gage

    Pedestrian bridge: The bridge truss has been positioned over 16th Ave. Residential tower + medical office: A basketball half court has been installed.
  9. N

    Uxborough Phase 1 | 45m | 14s | Western Securities | Gibbs Gage

    Most of the parking lot remains unpaved, though they have sodded and planted trees around the perimeter. Perhaps this is a sign that phase 2 is happening soon. Residential tower: Tenants are starting to move in (you can see grills and patio furniture on the balconies). Medical office...
  10. N

    Wellings of Calgary | 49.68m | 14s | Wellings of Calgary | Onespace

    The back/south tower is now complete and tenants are moving in. Construction of what looks like new townhouses beside Wellings and land is being prepped behind it:
  11. N

    Trinity Hills | 20m | 6s | Trinity Group

    The Podium at Aiss'ka'pooma: Skyway at Medicine Hill phase 1: The Village Townhomes Wolf Run: Construction has begun on new townhouses (judging by the footings) on the other side of the ravine next to Wellings. New phase of the Village Townhomes? Medicine Hill Block H apartments:
  12. N

    SAIT Campus Centre | 24m | 5s | SAIT | GEC

    Pics taken on a cloudy Sunday evening:
  13. N

    Aria Encore | 56m | 17s | Gracorp | Zeidler

    The tower on the east side looks to be topped out at 16 floors of concrete. The 17th floor looks like it will be steel. Pics taken on a cloudy Sunday evening:
  14. N

    Blume | 48m | 15s | Remington | Systemic Architecture

    Blume appears to be complete. Some night shots (the first photo is from the storm water pond in the middle of the Dalhousie Station bus loop): Some day pics:
  15. N

    Aria Encore | 56m | 17s | Gracorp | Zeidler

    The shorter west side is topped out at 8 floors. The taller east side is at 16 floors -- one more to go.

Back
Top