    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    Not much going to happen this week, the bitter cold means the crane can’t operate (-25°c limit) poured the 11th floor slab last Thursday. Should get back in the groove of things next week.
  2. jhbuilt

    BMO Centre Expansion | 25m | 5s | CMLC

    thanks for posting that @MichaelS glad I wasn't the only one to think that. guess time will tell. As others have said the massing once complete will change the balance and perspective. maybe lighting and landscaping will beautify this brick wall.
  3. jhbuilt

    BMO Centre Expansion | 25m | 5s | CMLC

    This is taken approximately near the old entry gate bit west of the old coke stage. Where 17th ave will connect through. Lots of precast with brick veneer, nice color, but Kinda of assumed there would be more glazing along here, especially giving the pedestrian interaction here with the new...
  4. jhbuilt

    Park Point | 106.98m | 34s | Qualex-Landmark | IBI Group

    Yes verve phase two would be nice to see go
  5. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    The count starts from the 3rd level which is the roof top amenities, 41st floor is last habitable floor (39 total) there is two levels above for the mechanicals.
  6. jhbuilt

    Scotia Place | 36.85m | 11s | CSEC | HOK

    Can’t have the “Flames” and a giant new arena when there is a climate crisis and a woke mob for council. Gondek is been great for attracting/ instilling confidence in investment so far
  7. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    This one has a better view of the placing boom tower
  8. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    Might get some tables flown today. Trying to sneak one more slab in before the new year. Can just make out the placing boom tower behind the core
  9. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    I definitely didn’t catch the joke 🤷🏻‍♂️
  10. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    The manufacturer for the windows on Arris west is in Korea. Many aluminum products are made in south east Asia (access to China, India and Australia) . While it would be nice to have more domestic production I doubt we will have much, Canada is not a large aluminum producer like China, we are...
  11. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    Will delay a bit on the interior trades, but we would do as much as we could to keep moving along. It’s likely that the window installer will be pushed really hard to catch up. Already working with the manufacturer to get more shipped asap so we minimize future delays, don’t want a start stop...
  12. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    Windows have been delayed due to the port of Vancouver. Should be around February now. Should be tying back and jumping the crane up around the same time.
  13. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    Working on installing the construction hoist aka skip.
  14. jhbuilt

    The Hive | 27m | 9s | Jemm Properties | LOLA

    I see a lot of mentions of no more beige and to be switched for white… my main point to disagree is that Calgary is generally quite a dusty city. We have plenty of dust from the Rockies being finely eroded along with the farmland in between the city and the mountains. White tends to show the...
  15. jhbuilt

    Arris - 5th and Third | 142.03m | 42s | Embassy Bosa | Amanat Architect

    Don’t worry there will be plenty of pictures from the west tower 😉