Tothewest
Active Member
Not to mention the precast lower bowl sections...unless they crane them in by leaving a section of roof open??Probably till those two cranes are not needed. Only way out for them
Not to mention the precast lower bowl sections...unless they crane them in by leaving a section of roof open??Probably till those two cranes are not needed. Only way out for them
Nice to see this, I thought it would happen, and it needed to happen.
2 meters seems like a lot. Is 14th ave currently lower than other streets? Or is it going to have a ramp between 14th Ave and Stampede Trail/5A?The current closure of 14th Ave that began on March 30 is expected to last into the fall. The plan is to raise the street by 2 meters.