Recent content by No_Problem

  1. No_Problem

    Stampede Hotel | 57.5m | 14s | Truman | NORR

    No, they plan on pausing the project during stampede this summer.
  2. No_Problem

    Plaza | 109m | 33s | Cantiro | GEC

    Yes I have also been told this, but more specifically that site mobilization is fully scheduled for the first week of May.
  3. No_Problem

    Bluestone | 78m | 18s | Amble Ventures | NORR

    The bp application is submitted and it looks exactly like this.
  4. No_Problem

    The Sentinel | 24m | 6s | Arlington Street | Jackson McCormick

    Looks like this job site may have struck a water line? https://calgaryherald.com/news/local-news/water-main-break-17th-avenue-businesses
  5. No_Problem

    Beltline Block | 118m | 36s | ONE Properties | Gibbs Gage

    The will be two new high rise towers, eventually. Plus the office conversion. The next tower will be to the south of the current tower they are currently shoring, but this is not in the current phase so timelines are unknown. The northeast portion of this site may be subdivided for future...
  6. No_Problem

    East Riverside Project | 52m | 16s | Bucci Developments | Casola Koppe

    This one has a BP application submitted. Looks like both towers in one phase of construction
  7. No_Problem

    Stampede Hotel | 57.5m | 14s | Truman | NORR

    Fun fact the street in this photo is owned by the Calgary Stampede. Private road.
  8. No_Problem

    Vibe | 51m | 13s | Slokker | Giannone Petricone

    - there will be no new parkade entrance for this phase of construction. You’re right, access to the Vibe parkade will be by removing the knockout panels. - Vibe will have 2 levels of parkade interconnected to the 3 levels from Verve apartments. - if I recall there will be 4 or 5 retail...
  9. No_Problem

    Stampede Hotel | 57.5m | 14s | Truman | NORR

    The partial bp and approved dp just happened simultaneously. The work completed until now was not related to the bp.
  10. No_Problem

    Beltline Block | 118m | 36s | ONE Properties | Gibbs Gage

    I wouldn’t bet against me haha
  11. No_Problem

    Beltline Block | 118m | 36s | ONE Properties | Gibbs Gage

    My money is on https://skyrisecities.com/forum/threads/calgary-vibe-51m-13s-slokker-giannone-petricone.34611/
  12. No_Problem

    Beltline Block | 118m | 36s | ONE Properties | Gibbs Gage

    Yes, the 36 storey residential tower on the NorthWest portion of this site will begin shortly. It will have its own brand new 3 storey parkade that connects to the existing 2 storey parkade. I will make an educated guess that excavation will begin in January.
  13. No_Problem

    The Kenten | 40m | 9s | Davignon Martin

    I think the scope of work should be clarified for everyone: They are completely demolishing and reconstructing the existing residential tower from floors 3 to 9 and enlarging the floor area of the building slightly. The 2nd floor condo units at the rear, and commercial units on the main floor...
  14. No_Problem

    1150 Centre Street SE | 121.5m | 37s | Oxford Properties | Zeidler

    I didn’t realize this forum is so emotionally attached to these buildings. Next time I’ll only post good news.
  15. No_Problem

    1150 Centre Street SE | 121.5m | 37s | Oxford Properties | Zeidler

    This project does not currently have a bp application.