Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Apr 03, 2020
Pastel Morning
6.6K
1
News
Apr 02, 2020
A Message to Our Readers
8.1K
4
News
Apr 02, 2020
Soon to be Gone
4.8K
0
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
nfitz's latest activity
N
nfitz
replied to the thread
VIA Rail
.
Seems an odd time to say this, given that the all-new rolling stock is all constructed, if not already here. Surely 7th ... it depends...
Oct 27, 2025
N
nfitz
replied to the thread
Roads: Redway Road Extension / "Leaside bypass"
.
I don't see an unpaved road in the aerial photographs. Are you sure that's not the Metrolinx tracks that are south of the CP mainline at...
Oct 27, 2025
N
nfitz
replied to the thread
Toronto
Toronto | Ontario Line 3 | ?m | ?s | Metrolinx
.
That's for storage tracks for the Maintenance and Storage Facility, etc. From...
Oct 27, 2025
N
nfitz
reacted to
smallspy's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Wow
.
The work being done was affecting the CPKC bridge overhead. It is expected that it may take another 4 or 5 years in order to engineer a...
Oct 27, 2025
N
nfitz
reacted to
Mariner35's post
in the thread
Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)
with
Wow
.
Not sure if they got everything done yesterday but ALL 6 lanes were open this morning. Nice to shave those 15-20 mins off the commute.
Oct 27, 2025
N
nfitz
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
Which bridge is that?
Oct 26, 2025
N
nfitz
replied to the thread
TTC Subway Station Construction/Modernization
.
Oh my! I don't spend a lot of time at St. Patrick or Osgoode (though have recently). So I missed the point the old tiles came out. The...
Oct 26, 2025
N
nfitz
replied to the thread
TTC Subway Station Construction/Modernization
.
The old ones on the left, don't seem so bad really - other than the ones on the bottom row.
Oct 25, 2025
N
nfitz
reacted to
DSCToronto's post
in the thread
Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)
with
Like
.
I looked at the City's Gardiner page...
Oct 25, 2025
N
nfitz
reacted to
Allandale25's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
Oct 24, 2025
N
nfitz
reacted to
Allandale25's post
in the thread
GO Transit Fleet Equipment and other
with
Like
.
Again, I encourage people to take note of the title of this thread.
Oct 24, 2025
N
nfitz
reacted to
SFO-YYZ's post
in the thread
Montréal Transit Developments
with
Haha
.
“Light rail”. Our local media’s inability to do basic research on transit topics…🤦 Don’t know a single Montrealer who calls it light...
Oct 24, 2025
N
nfitz
reacted to
pawlyshyn's post
in the thread
Cycling infrastructure (Separated bike lanes)
with
Like
.
I don't understand why anyone WOULD listen to a podcast on YouTube. It's not a video, after all.
Oct 24, 2025
N
nfitz
reacted to
A 6264's post
in the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
with
Haha
.
Thanks for your response. I do think the long, long, opening process was mostly dictated by things like insurance contracts. I hope...
Oct 24, 2025
N
nfitz
replied to the thread
Toronto
Toronto | Billy Bishop Toronto City Airport Pedestrian Tunnel | ?m | ?s | Ports Toronto | Arup
.
Ah - only a 10 to 15 minute ride if there's no traffic. With a single expressway one way to another. I'll have to try LaGuardia one day...
Oct 24, 2025
Members
Back
Top