doubt park central is late 2023, (Arris west is fall 2023 and they are topped out already,) this won't be topped out till mid 2023 and therefore it will be into 2024 as well.
it hasn't stayed the same for months... look at the photo updates.
Window install and deliveries have been delayed due to re-shoring needed for the heavy transfer and roof slabs
I have pictures myself from 37 and then 42(roof) only 7 weeks apart, it did slow down as they got into floor plate...
Tables started to be moved up today for L40 Slab, this is a 14" transfer slab, 30% thicker then the normal slab requires extra shoring down the tower to support the weight,
there is three full slabs left L40, L41 & L42(roof)
Bosa wasn't entirely pleased with Loblaw's changing formats, as Bosa was trying to originally market this as a premium condo.
I believe Loblaws felt the premium grocer was saturated already with blush lane in Bridgeland bite in inglewood and sunterra in Victoria Park, add in urban fair and they...
Final Crane bump took place this weekend.
Slab 36 was poured last Monday the third tie back is on Level 35. verticals for Level 36 will start tomorrow (Monday). L37 is a bit of a transfer slab as the floor plate changes for L37-39 and then again for L40-41
Windows are on L30.
unfortunately I'm...