Recent content by jhbuilt

  1. jhbuilt

    Oliver | 121.3m | 35s | Centron | Gibbs Gage

    doubt park central is late 2023, (Arris west is fall 2023 and they are topped out already,) this won't be topped out till mid 2023 and therefore it will be into 2024 as well.
  2. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    it hasn't stayed the same for months... look at the photo updates. Window install and deliveries have been delayed due to re-shoring needed for the heavy transfer and roof slabs I have pictures myself from 37 and then 42(roof) only 7 weeks apart, it did slow down as they got into floor plate...
  3. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    Tables started to be moved up today for L40 Slab, this is a 14" transfer slab, 30% thicker then the normal slab requires extra shoring down the tower to support the weight, there is three full slabs left L40, L41 & L42(roof)
  4. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    Bosa wasn't entirely pleased with Loblaw's changing formats, as Bosa was trying to originally market this as a premium condo. I believe Loblaws felt the premium grocer was saturated already with blush lane in Bridgeland bite in inglewood and sunterra in Victoria Park, add in urban fair and they...
  5. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    There is a floor plan change on L37 where the sky suites start. That unit ends up with a patio. The step creates an area for insulation and drainage
  6. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    correct and there are couple pictures from the deck showing that corner with the steps in the slab
  7. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    Working L37 right now, has a floor plan change.
  8. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    Will likely be mid rise 8-16 story kinda thing. Could be a surprise though with some extra height 🤷🏻‍♂️
  9. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    Currie is starting the planning stages. Still a ways out.
  10. jhbuilt

    Arris - 5th and Third | 142.03m | 41s | Embassy Bosa | Amanat Architect

    Final Crane bump took place this weekend. Slab 36 was poured last Monday the third tie back is on Level 35. verticals for Level 36 will start tomorrow (Monday). L37 is a bit of a transfer slab as the floor plate changes for L37-39 and then again for L40-41 Windows are on L30. unfortunately I'm...
  11. jhbuilt

    NUDE | 63.4m | 18s | Battistella | S2 Architecture

    NUDE nearly at grade now
  12. jhbuilt

    Era | 41.15m | 13s | Minto

    max iPhone zoom from my balcony... Era crane coming down