Park Central | 134m | 39s | Hines | S.C.B.

General rating of the project

  • Great

    Votes: 23 24.5%
  • Very Good

    Votes: 52 55.3%
  • Good

    Votes: 14 14.9%
  • So So

    Votes: 4 4.3%
  • Not Very Good

    Votes: 0 0.0%
  • Terrible

    Votes: 1 1.1%

  • Total voters
    94
The next question is how long until they break ground? If they were going through the trouble of doing the demo, I bet they're starting soon.
 
concrete, metal, wood, ceiling tiles, carpet, drywall can all be reused or recycled.
 
This one will be rentals.

Has this been confirmed? Or is it speculation based on prior projects from Hines?
I've got a deposit burning a hole in my pocket for a pre-construction condo building, beltline area, with a 2020-ish possession and this seems to match my requirements pretty on point.
 
Yes this will be rentals according to Ellis Don the G.C.. Hines have done no marketing for this project whatsoever as they would have to do to sell as condos. A DP was submitted and approved.
 
Hi Group,
I took a Look t the "Hines Website". HUGE, Did not Know how Big they are. Surprised they were a Big Player in 8th Avenue Place, Hope they have a Few More Big Projects for Calgary.

Tnx,
Operater,
 
3D3E927C-C92D-49F0-815F-52B7917F3951.jpeg
A62A065C-1519-42F5-9896-76EF357EBEB5.jpeg
From this morning’s walk. Just about froze my nuts off!

aaa-8C83F7A5-BC2C-4150-AE6C-69F77F3C3611.jpeg
 

Attachments

  • 3D3E927C-C92D-49F0-815F-52B7917F3951.jpeg
    3D3E927C-C92D-49F0-815F-52B7917F3951.jpeg
    483.6 KB · Views: 327
  • A62A065C-1519-42F5-9896-76EF357EBEB5.jpeg
    A62A065C-1519-42F5-9896-76EF357EBEB5.jpeg
    491.1 KB · Views: 357
  • aaa-8C83F7A5-BC2C-4150-AE6C-69F77F3C3611.jpeg
    aaa-8C83F7A5-BC2C-4150-AE6C-69F77F3C3611.jpeg
    436.9 KB · Views: 358
Last edited by a moderator:
Thanks for getting these pics. I thought it was cold here in Texas, but I need to reminded from time to time what the definition of cold really is! I hope it warms up by the end of the month when I get back.
 

Back
Top